For the time being, I added a junction box to replace the old single fuse sub panel, and added 12AWG from there to the new sub panel, to one of the phases. I understand doing this is not to any code. I only have the few circuits running off it, until I get the 6AWG underground feed in place, then I'll properly wire the sub panel with the two phases and connect the 240 branch.
Added a ground from the panel to the conduit used to supply the 120v supply
Wiring to the 240 outlet above, waiting for the 10AWG individual wires, then I'll wire the receptacle
added a GFCI receptacle & a regular on the load side, by the door, separate fused branch from the branches in the west addition and what will be on the south wall. I will continue that branch into the north wall when that addition happens
All the conduit tidied up on this side now
After that - the (Electric) power steering pump on the C30 is on the way out (130K miles) - making a nasty scream under load (cornering).
Looking online, the FoMoCo part is pretty indestructible, except for the lower shaft bearing, which is not in an oil bath like the upper one.
The unit is not intended to be serviced, so a Filter cutter is required to cleanly cut off the motor cap. after that, the reservoir is removed by stretching the Oetiker clamp, then the pump is removed, followed by a drive gear , c clip & washer - then the motor shaft can be tapped out of the upper bearing.
bearing destruction
New Timken bearing
installed
more to come