Everything posted by HusseinHolland
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Slowly getting the south wall cleared. Need to move all the stuff at the base so I can remove the sheathing, add insulation & pegboard, then rethink the shelving for this section
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Larger items - Volvo C30 Turbo/manifold, cat/DP, Intercooler plumbing, driveshafts, spoilers, bumper panels/skirts, Instrument & dash panels, Headlamp assemblies, Boxes of relays, Bosch injection & ignition components, Boxes of parts for other projects: LS conversion parts for the pickup, VQ35DE subframe kit for the Z, new repro door panels & rear spoiler for the Z, and so on. That will need tiding up also. 🤪
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Continued with the clearing of the shelves on the south wall, which also meant I had to make some shallow shelves on the left of the back wall to store more chemicals Put stuff up on the right, so slowly making way also added a 7" deep x 12' strip of pegboard on the backside of the LVL beam, to store rolls of hose that were also taking up shelf space. Much more accessible this way - and harder for me to forget I already have
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Light rain (mostly) much of the day - even so I spent most of it outside, moving stuff around behind the garage. Just needed to make it a little more orderly than it has been the past couple months. Had to cut a bunch of 25'-30' bamboo in the far left corner, so I could relocate the truck bed liner & other bulky items out of sight. One of my neighbors likes to use the bamboo poles for his veggie garden, so I cut some down to about 10' After that I got some top coat on the shelving and upper sheathing Still had a little time, so I cleared the top shelf on the left & removed it, so I can move forwards
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Hey - the two lower siding runs I'm going to replace, and cut out the sill plate as needed, then I'm going to pour a concrete foot(ing?) and put a new sill on top. Outside, I'm going to keep the gravel level below the sill so rain etc can't creep up/in to the siding Got some primer on the upper sheathing and top shelf, I spent the day in the city at the Whitney Museum with fellow Art educators, so that was all the time I had to spend on the garage.
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Still plugging away on the inside sheathing/insulation/shelving - I cut the 4x8's in half so I can put the top back together, and deal with the sill plate later. I've got too much stuff under my feet right now 😞. Added 3' of pegboard (H) and 10' wide Putting a 10' shelf up high There is a gap at the base of this 4' section (2nd in from the right/west end) where the clapboard rotted away from soil/moisture, I stuffed foam in it for now, just to try & deter critters. Raining steadily for the last couple of days, and in fact there is not a lot of water on the south side of the garage, I did add a drainage gutter just before the rains came.. I think I can get away with just putting a gravel bed to keep soil & water away from the foundation.
-
ECU Connector
Good point - I hadn't considered he meant the ECU side connector/housing (825213-1). Those you can also buy new....
-
ECU Connector
The part number is actually right on it - 925 380. Mouser carries them (JPT terminals separate) for about $9
-
ECU Connector
Should be the same 35 pin AMP connector used on all L-Jet systems, Fiat & others used it through the '80's. Example on eBay
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
We have a high water table - I have a sump pump in the basement that operates much of the year, just less in the July/August time frame. That was the one that died just before we went to Baltimore & partially flooded the basement main area. I'm going to have to figure out what to do about the drainage behind the garage, however I don't want to get sidetracked on that right now, so I'm going to deal with the sill repair & siding, and leave the drainage until later on. Rained all day - so I got the receptacles wired (GFCI at the start of the run, shown earlier) & added a waterproof housing & switch for the new exterior door lighting Cover didn't arrive in time for me to add it before this pic This sucka is bright!
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
This is the first time I've tried them. I've never had an issue with the twist nuts, and I have plenty of them, so I will likely continue to use them. Yeah, I'm glad I didn't realize they were there in the warm weather. Since rain is in the forecast, I decided to dig off the south side of the garage, where I had just removed that plywood. So that I could figure out how bad it is. This is as far as I got before my back said that was enough.
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Wired the overhead LED for the new space Added a GFCI receptacle & switch for the light. The other receptacles will be fed from this one Wired the outside receptacles Added a shelf here - I'm going to use the right side for my laptop removed the 4x8 sheet of plywood behind the press - cut in half, I'll be adding pegboard above. I'll have to address this mess from the outside, so I won't screw the plywood back in place for now found this above the door when I removed the plywood to run conduit for an outside light fixture above the doorway I like these push-lok connectors - so much easier to confirm connection than the old twist nuts
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
It was in the 20's this morning, but the sun was out. I framed out the casing on the window, and got the rest of the siding up & primed before it was time to clean up for the day. I cut the sill to 12º, and back-caulked everything. Have to get done with the exterior soon, I'm tired of looking at the tarped wood pile
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Small things again today. Primed some stuff inside, added some pegboard near the door, and since the sun was out the past couple days, the snow cleared outside. I started putting the siding up while I can, even if it was only 30ºF in the sun. Supposed to rain later in the week, so I'd like to get it done before then
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Thank you - the garage footprint is only inches over 18' sq. I'm used to constantly moving stuff around anytime I work on a project - that more than anything I'd like to reduce. Adding the 4' on the back helps immensely (given the scale) - moving forward I'm going to draw up plans to add on to the North wall, again, not much because I don't want it to be too obtrusive going in towards the house/deck. Even if I add just a single floor 6' additional width over the 18' depth, it would give me room to clear the main floor completely as a work space, which would be great, and it wouldn't overly impact the side yard. I still prefer to work on the cars outside if the weather permits, but much of late winter & early spring is either too cold or too wet...
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Got it. Yes, I do have a fire extinguisher in the garage, however I've never had to use it, so it's probably time for a new one. At least now, they won't be so close to where I'm usually welding... Only had a short time today, so I bought a 12' 1x10 board & made a storage shelf on the beam, so I have somewhere to stow the less used items I still need keep track of, vs. the stuff I put up above in storage & subsequently forget I own... Added a support ledge All of the boxes on the lower half contain electrical connectors and terminals. No point putting them in the storage bins, there are too many variants Put up the storage bins on the left So happy I got the pegboard Next I want to clear this wall, so I can make shelving more uniform, and maybe some more pegboard - I'm loving that stuff. It's already been useful. I feel like a kid in a candy store, can't believe it's taken me so many years to start properly organizing my tools & supplies. Much of what was here, is now in the back ,at least temporarily. There is also all this mess in the front to figure out - MIG, TIG, Plasma, Spot welder, Oxy/Acetylene, and the V8 drivetrain that needs to get installed in the pickup truck.. I also want to get rid of these shelving units on the North side (currently loaded with stuff that was on the other side) to make it easier to move the car in & out without occupying quite so much floorspace
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Sorry, the joke is lost on me Only odds & ends today, moving stuff around & made a ramp to offset the 2" step for wheeling stuff in & out Besides that I had to rebuild a caliper on my old Volvo. It was a reman I bought a couple years ago
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Slow going today. I had to start hanging tools & moving chemicals, I just had no floor space to move around in. I wanted to get the press moved into the main floor, and I did eventually, however I had to juggle a whole bunch of crap to make the space, just to be able to maneuver it. I got side tracked figuring out the storage bin ideas for all the small stuff current dispersed in individual plastic trays in multiple locations. I bought 2 containers to try - and decided that instead of wasting shelf space it made more sense to suspend them on the West wall, where I was vacillating on adding additional shelves in line with the ones I already added. The conundrum for me was that the shelves would not be the same height on either side of the window, and that would bug the crap out of me DTR. Put a bunch of M3, M4, M5 & M6 riv-nuts, and screws of different types (counter sunk, pan head Phillips and Allen in rows from L-R. That calmed me down a bit 🤪 I've ordered another matching pair to put on the other side of the window. I will make sure the spacing and offset matches 😁 Chemicals and tools I had moved earlier in the day. Probably not their final testing place. These were all hanging on nails in the old West wall, along with about 15 pairs of pliers that I need to find the correct pegboard holder for. Many of these hangers are too long - it was cheaper to buy 100 6" than 3". I'll just cut down the ones that need to be shorter. Finally clearing the shelves where the press needs to go Cut the shelving, cleaned up the area, moved & levelled the press After that I wrapped up with top coat on the west & north wall of the area Feeling better now about how the day went by.
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Thank you Steve. I'm retiring from my day job this summer, so I'll be spending much more of my day out there. I'm going to have to work my way around the rest of the garage eventually. Had to buy some shelving today - the ones I have left over from previous work were not deep enough for what I wanted on this side. Bought 15' of 1x12 to make the bottom 3, then used the old shelving to make the uppers. I spaced these wide so I can fit small parts storage bins (16-18" tall) on the elbow height shelf, and large tool cases under the bottom one. Trying to plan this out as carefully as possible. I always forget to take in account something, same as working on the cars... primed I'm going to add a 1/4 round to protect myself from walking into these Put the heat on in the garage so I could top coat the south wall shelving. Found I had 1/2 gallon of a medium grey left over from something. I haven't bothered with heat up to now, as I have the door open much of the time, going back & forth cutting wood, etc.,
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Added some more trim to the exterior framing Started on making the bench. setting it at 32", so that the added vice height will be around 40" or so framing for the window trim, sill cut, side sections cut from old 1x3 1x3 top plate installed cut & fitted the north end wall plywood. I'll make shelves for this side, 9" deep to edge of pegboard new wiring box (next to power strip) for power supply & switch that feeds the new outlets and ceiling light fixture, have to decide where to tie it into existing circuitry. At some point I need to install a new mains panel, with 240v supply.
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Primed the end wall. It's was about 20° in the garage at that time, so I'm not expecting it to dry anytime soon. I think I'm going to look for a light gray paint for the top coat. Added more foam and sealing foam behind where the pegboard is going, since it can't have that layer of sheathing like the bottom half. I did do the same on the left side. Cutting all the large pieces of wood outside, it was up to about 25°, so not absolutely frigid for short durations. Pegboard on the right is also done now. The panel below it is not secured yet, I still have to do some more wiring. I forgot to add an outlet to the outside wall. So I will run that through that North wall, behind that lower sheathing. Did a little more priming here and there to even it out. Have to do the inside facia for the window trim - I'm using 1x3, the old stuff was that size, so can I reuse some of it, and I bought two 8 ft lengths to do the top and bottom
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Had almost 2 hours after Pilates with the Mrs. this afternoon, so I managed to get the 9" deep shelving up on the end wall, about 10-in inside spacing between them, except for the bottom one that is a little over a foot to allow for gallons of coolant etc.,
-
4/75 Datsun 280Z; Leaf Green, CA market, 250K miles, Long Term Project 03/2023-
Added the positive terminal cutoff switch Edit- I had to bend it 90°, it was straight, and due to the offset, it would have put the fuse panel too high and hit the hood on closure. Started wiring on this wall, and sheathing/pegboard for the upper half. I've never used pegboard before, but it seems like a good idea for all the crap I have that was hanging off of nails for my old wall.