Everything posted by HusseinHolland
-
FPR project - cheaper, more available (for a while anyway)
Coming back to this for a minute - since 2.5bar FPR are not easy to come by, what about using a 3bar regulator & going with newer (lower rated) injectors that don't require the ballast? As far as I can determine stock 280Z injectors are 188c/min or 17.9lb/hr @ 2.5bar - most if not all injectors are sold rated at 3bar values. Can't find a calc right now that will provide a calculation to determine what value injector will run 17.9lb/hr @ 3bar....
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
Welded up all the seams, took almost 4 hours(!) After that, I had to reinstall it to figure out the center mount. I decided to make one that used the stock mounting points Once I had that figured out, I tacked it in place & then removed the entire exhaust to finish the mount welds for this & the rear muffler hanger Archie was hanging around me much of the day I had forgotten about the trans mount / carrier bushings, so I did those now put the exhaust back in (hopefully for the last time) clearances still good Hangers Still waiting for the Redtail Performance tailpipe 😞
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
Got the rest of the front section figured out. No room for the 3" resonator though. Added a dogleg to get good alignment with the rest of the front section added a straight section off that, into a 3" cat, then another 10" section into the mid connection good clearance all around fitted the cat behind that 10" section between cat & dogleg into 3" flange removed again to tack rear mid section re-installed one more time to figure out the hanger off the transmission case, then removed. Now I have to seam weld all the junctions
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
Change of plans - I removed the front pipe. One of the Datsun guys on Turbobricks said the 2-1 junction is a severe choke point. His solution was to make a new 2-1 section in 2" pipe I can't weld something like that, Dealing with welding those to the flange, and the collector are extremely awkward, from my experience with the first header on the K24, I'm not willing to risk it. Stock front pipe. Flange. Making 2" pipes fit the flange would be tricky. I thought about using a 1 7/8" holesaw to get it close, then grinder to get the rest. I don't have a spare DP, so just not worth it. taper point, only about 1.5" ID in there So, I cut off the upper section of the DP where it's approx 3" wide & modded another section of my old C30 3" exhaust to fit. after a bunch of back & forth, I tacked it here. To minimize the reduction in the stock collector I cut it so there is only about 1/8" tuck. test fit - clears the heat shield (next to my finger) by the same amount as the stock pipe - just looks like there's no clearance It was raining at this point, so I took it down & seam welded the joint. But.. it moved, so I had to cut the pipe & add a pie cut (to be welded later) to get the pipe pointed where it needed to go New cat & used resonator from a Volvo S40 T5.
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
Made a bracket (from a Volvo dash support) to utilize the stock hanger point at the front end of the muffler reinforced to make sure it can't flex. The lip at the top tucks over the frame bracket muffler hanger attachment in place. Drilled an inboard hole in the stock welded bracket to positively locate the new bracket. With that figured out, I tack welded the hanger to the muffler Removed & finished the seam welds for the muffler inlet & tailpipe section. Just have to weld on the Redtail exhaust tip when it gets here.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Got the stub axles & flanges back from the machine shop. Now I have to weld everything. Hubcentric flange for locating the wheel Inner flanges modded to accept the Silvermine flanges (also modified to be centric). Collar is to increase the weld surface area Will be like this. Total depth to inner surface is 29mm, same as stock. 4mm inset for CV cap, which I will remove if the stub axle depth becomes an issue
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
TIG for this - it's all stainless. I could use my MIG I suppose, but I don't have stainless wire for it. TIG is cleaner for pipe anyway. Where I had good butt-joins, the welds are clean (enough, I'm not a professional). Where there was discrepancy/offset, so so much. More work on the exhaust today. Got all the tacked seams welded, and figured out the muffler placement cut down the 3"-2.5" step for the available spacing have to figure out the hanger here, have to make sure it pulls it slightly away from the spare well like this maybe or here, to push it away from the spare well. There is a hole in each corner of the gas tank, I could use this one, and add a smaller outward placed one to locate the strap from potential rotation maybe one set here
-
3" Exhaust, cat-back. Prep for VQ35DE conversion
Since I had to cut off the exhaust to deal with all the rear suspension work, I decided to put together a 3" SS rear section, starting after the existing cat, then going to a 2.5" Stainless Works rear muffler (ran it on my X1/9 K24 swap for a few months). The 3" SS exhaust I put together from a exhaust I had made years ago for my Volvo C30, before I converted it to AWD & had to make it all over again. Forgot to take pic before I cut it up - this is what it was Eyeball the general placement, then cut, & tape together to check clearance off the forward crossmember and lower control pivot & diff casing tack welded, then recheck fit I'll be adding a 3" - 2.5" step from this into the muffler looks pretty good step down & dogleg to attach to existing exhaust/cat. I'll rework the entire exhaust forward of the 2 bolt 3" flange when I do the VQ35DE 2"-2.5" - 2.5"- 3" steps
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Degreased, then soaked the rear tube/hubs in acid, then cleaned up & treated them with rust convertor. I'll paint them tomorrow.
-
75 280Z Steering Wheel / Hub Help needed.
Finished the steering wheel. sanded the epoxy, primed & painted reinstalled the horn contacts & pad retaining ring Back in the car
-
Heater Core Alternative - Escort Core into 260/280
@Captain Obvious - question for you - do you know the correct pin release tool for these Yazaki terminals? I have a 70's VAG terminal set that has the barrel-type release tool, but the sleeves are not the correct ID/OD of the Yazaki. I used a pick to remove the old ones, which was fine here, however I'd like to be able to remove good ones without damage 🙂 Any pointers to a source?
-
75 280Z Steering Wheel / Hub Help needed.
Modified the vintage aftermarket wheel to fit. Cut the hub from the original worn out wheel. The advantage of this is that it will sit further away from me. With my height, the stock wheel is too close to me when the seat is correctly placed for clutch pedal operation. This wheel is shallower. welded after this - forgot to take pics added JB weld to fill the minor gapage on the front side
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Dropped off the stub axles to get the outer flange nubs cut to accept a centering ring, and the inner flanges to be cut down to 25mm, with a 3mm depth shoulder 49MM OD. Silvermine flanges will have the center cut to 49 (from 45)mm to seat on the shoulder, with a total depth of 29mm same as stock offset. I'll add pics when I get them back
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Thank you ! That's the thread I read originally, then couldn't find - that confirms the need to have the flange flush with the existing depth, which is what I plan to do anyway.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
I'll see if my local Nissan dealer can get them - or even better, has them. 43262-W1200 - about $6 . The stock ones are 19mm deep, standard flanged locknuts should be shallower, so thanks for the suggestion. Worst case, I can tack the new nuts with my MIG after they are torqued.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
I think I mentioned it last week, but not specific to Silvermine. The pics above clearly show the Silvermine flange design - they cut the inside to a depth of 4mm to allow the stock flange to sit that far in. Still means 8mm depth is lost for the new CV shaft. I want the flange set to the same depth as the stock one. Haven't found a thread that gives the exact length of the stock driveshaft compared to the 300ZX T axles. Good idea on tacking the nut. I've been reading the thread he laid out - there are a lot of conflicting posts within it - ppl using custom axles, 300ZX NA axles, etc., etc.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
The Trakmotive axles do come with the Silvermine kit, I asked him that when I ordered the flanges. He said the binding issue is with cars lowered more than 1"
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
I posted separate work threads in the appropriate forums, I assumed that was the correct approach for the site. I didn't see where the build thread category was hidden until GrannyNot asked if I had one... I'm not using aftermarket control arms. The whole point of modifying the flange setup from the way Silvermine supplied it (loosing 8mm depth) is to avoid the binding that can occur (supposedly only with lowered cars). I've communicated with him by email regarding changes to his design, but he wasn't too helpful. My car already has 250K miles, I don't really want to keep the stock shafts for when I do the VQ35DE conversion. I'd rather deal with it now than later.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Stub assembled with bearings, sleeve, inner flange, washer & nut. I enlarged the ID of the old bearings so I could do this test without needing a puller for more than the inner flange. I can flats to the stub, to allow it to be peined in place. I'll need to cut 3mm off the nut, so the flange will be minimal. I guess I can also loctite the nut instead of flying on the pein. Alternatively, I leave the lip as is, and remove the CV cup cover. 16mm from washer to outside of flange. Nut is 19mm. Torquing the nut may reduce the height by a mm, I suppose. The CV adaptor gets welded to the old flange. As I stated above, the problem with the design is that I loose 8mm off the travel of the CV shaft, hence my desire to re-work it so that the modified flange sits at the same depth as the stock flange (35mm off the back side of the dust cover) For the hub-centric rings, I'm going to have the existing nubs shouldered so the sleeves sit concentrically outside them. The rings cannot be more than 12mm deep. centering rings cut from used Volvo hubs - OD matches OD of existing Datsun flange (63mm), so no issues with fitting the rotors EDIT: not sure why the site is duplicating images - it won't allow me to delete this one, either
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
I bought the Z31 ('87 300ZX T) axles (NI8435, NI8442) that go with the Silvermine flanges - Trackmotive brand off RockAuto. What I don't like is that the existing flange doesn't sit in all the way, so there is about 8mm lost in terms of overall depth for the new axle, which as we know is longer than stock. The other factor is the one you mention, that Nissan didn't bother making the flange concentric with the hub/axle, so that has to be addressed. The way the plates are supplied, they are supposed to be welded in to the recess provided, but since the stock flange isn't hub-centric a jig of some kind is required to center the weld flange to the hub. What I'm thinking of doing is removing the inner flange & having the hub shaft turned with a 4mm shoulder for the new CV flange to seat on, so I can get the flange surface back to stock depth. That should prevent the CV from bottoming out & binding, I hope. stock flange 6mm thick new flange is 12mm Old flange only sits 4mm into recess other side recess for CV cup is 4mm
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Took the rear struts & hubs apart after doing the Fuel pump setup. Removed the drum brake back plates that are no longer needed. cut down the nub of the spindle, to make sure the Z31 CV cap doesn't hit removed the (too short) wheel studs & cleaned the outer flanges Still not happy with not having a hub seat for the wheels I may weld on a sleeve (cut from a Volvo), that will allow me to use a hub centric ring (65.1 - 73.1) to set the Konig wheels. Have to have the nubs turned down in that case, to get a good seat for welding
-
75 280Z - Updating fuel feed & return lines in the engine bay
Finished up the fuel pump/pulse damper install today Used some preformed nylon line cut from a Volvo, mostly likely. That put the pulse damper where it needed to be to connect to the feed hard line With that figured out, I made a bracket to support it welded to the fuel pump bracket hook up the pump wires before installing the assembly All up out the way now Installed the correct return line , that was also the wrong ID
-
75 280Z - Updating fuel feed & return lines in the engine bay
Dropped the (aftermarket) fuel pump & feed hose today. I don't like the way the pump is fitted either. Original schematic of layout redrilled the mount plate to rotate & move the (new Bosch) pump up & out the way somewhat, adding Quick -Release fittings, to get rid of the large loop on the low pressure suction side Volvo fuel hose 1312257 11.5mm ID sold by the meter . I was going to put an inline filter here, however both versions I purchased were less that 3/8 OD, probably close to 5/16 Have to fit the pulse damper above. I won't need it with the VQ35DE install, so I'm going to make it easier to remove
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
There are plugs to be removed so that grease fittings can be inserted? I was going to hold on to the pair that are not hammered. I figured the brake parts may also be worth something to someone, so I'll clean everything.
-
75 280 Rear Suspension Work & Disc Brake Conversion (MilkFab)
Dropped the struts/hubs after work, no drama. All drum brake parts removed. I don't want to hack up the back plates, so I'm going to pull the spindles. This Volvo tool (999-2846) intended for old RWD prop shafts fit the Z U-Joint Hopefully I'll have the hubs apart tomorrow, and replace the strut inserts and coil springs